Plumbing a PEX Water‑Supply System



  1. Install copper manifolds (one for hot and one for cold) in an accessible location central to the fixtures. The manifold should have one outlet for each supply line it will support (fixtures that require hot and cold supply will need a separate outlet for each). Run supply lines from the water heater and water main to the copper manifolds. Connect the supply pipes to the manifolds with crimp fittings.
  2. A manifold may be attached vertically or horizontally, but it must be anchored with correctly sized hangers screwed to the framing members.



  3. Starting at each fixture (and leaving at least 12" of extra pipe exposed), run appropriately sized PEX through holes in the framing to the manifolds. Pipes may be bundled together loosely with plastic ties. Protect the line with a nailing plate at each stud location. Be sure to leave some slack in the supply lines.
  4. Support the pipe with a plastic hanger near every floor or ceiling and midway up vertical runs. Also use hangers to guide pipe near the beginnings and ends of curves and near fittings. Use a plastic guide for sharp curves (inset). Do not bend PEX so sharply that it kinks.
  5. Cut each branch supply line to length (leave some extra in case you need to recrimp). Install shutoff valves for each outlet (most manifolds come with preattached valves). Connect the PEX branch supply lines to the shutoff valves. Label each pipe. Use a short length of PEX and a plug to seal any unused outlets (inset).  

Thank you for reading about Plumbing a PEX Water‑Supply System.

Comments